台間玉貸機およびその制御方法

Inter-machine ball lending machine and its control method

Abstract

PURPOSE: To prevent a power supply circuit from being overloaded by momentary flow of a large current due to the simultaneous start of operation that lent balls are discharged in accordance with remaining money at the time of power-on after a power failure in the case that many inter-machine ball lending machines are provided. CONSTITUTION: Remaining money is discriminated in a step ST2 after power-on; and if remaining money exists, the wait time due to random number values generated in a step ST3 is set in a step ST4, and the normal ball lending operation is started in a step ST10 after the elapse of the wait time in a step ST5. Consequently, the start time of the operation requiring a high power consumption is different among inter-machine ball lending machines though remaining money exists, and the momentary occurrence of a large current is prevented. COPYRIGHT: (C)1993,JPO&Japio
(57)【要約】 【目的】 多数の台間玉貸機が設置されている場合にお いて、停電後の再投入時に残金により、貸玉を放出する 動作が一斉に始まり、瞬間的に大電流が流れ、電源回路 が過負荷になることを防止できる台間玉貸機を実現す る。 【構成】 電源投入後、ステップST2において残金を 判断し、残金がある場合は、ステップST3において発 生させる乱数値による待機時間をステップST4におい て設定し、待機時間経過後ステップST5において、通 常の玉貸し動作を開始する。従って、残金がある場合で も、各台間玉貸機により消費電力の大きな動作の開始時 期が異なるので、瞬間的な大電流の発生を防止すること ができる。

Claims

Description

Topics

Download Full PDF Version (Non-Commercial Use)

Patent Citations (0)

    Publication numberPublication dateAssigneeTitle

NO-Patent Citations (0)

    Title

Cited By (0)

    Publication numberPublication dateAssigneeTitle